The stair beat the lift
Six months after moving in, the client's badge data showed a third of all inter-floor trips take the garden stair. Nobody wrote a policy — the section did the persuading.

Our first completed tower: a compact headquarters where a garden climbs the building — one double-height void spiralling from plinth to crown.
88 m22 floorsCompleted2025
Brainpark was built as an office park you drive to, and the brief read that way: floor plates, parking ratio, done. We argued the site could carry a different ambition — a building that gives a campus park its vertical counterpart, and gives the tenant stairs worth taking.
The answer is the helix: a double-height garden void that steps up one face of the tower, two floors at a time, turning as it climbs. Every workfloor touches green twice — once at its own level, once looking down into the void it shares. The stair through the gardens is the busiest route in the building.
Every VANTA sheet marks the same three lines — plinth, datum, crown. This is Helix HQ from its own street corner, raised the way it will be built.
Six months after moving in, the client's badge data showed a third of all inter-floor trips take the garden stair. Nobody wrote a policy — the section did the persuading.
Each void carries 65 cm of soil on a strengthened slab edge — enough for six-metre multi-stem trees, not planter shrubs. The structure paid for it; the photographs earn it back weekly.
The top garden doubles as the company forum. On launch nights its light is visible from the ring road — the building's own notification.

Brainpark, Rotterdam — 88 m above the street.
We hired for two years on the strength of the stair alone. People walk in and understand the company.
COO, Helix Technologies
